Eurospec DSB8225LSC Security Door Bolt Long (LEAD TIME: 2-3 DAYS)

SKU: DSB8225LSC

£21.95 In stock

Description

This item is on a direct delivery and will be delivered separately. They may also be subjected to longer lead times and cannot be amended, returned or cancelled once ordered.

Eurospec DSB8225LSC Security Door Bolt Long

Contract Door Security Bolt, (Long version) sometimes called a Rack Bolt. The bolt is morticed inside the door edge and can be locked or unlocked via a separate splined key or with a fixed splined turn. The bolt has an internal sawtooth rack mechanism int

This item can be mixed and matched for a chepaer price with selected Carlisle Brass products alongside products with the ‘Mix & Match’ logo displayed beside the product title. The price will be reduced once more than one eligible product has been added to the basket.

Reviews

There are no reviews yet.

Be the first to review “Eurospec DSB8225LSC Security Door Bolt Long (LEAD TIME: 2-3 DAYS)”

Your email address will not be published. Required fields are marked *